It’s day one of a plant turnaround. Everyone on the crew is qualified. They all have the tickets, the training records and the sign-offs to prove it. Most of them have never worked together before.
On paper, this is a competent team. In practice, it’s a group of competent individuals who don’t yet know how each other works, what to expect next, or when something the person beside them is doing doesn’t look right.
That gap, between being signed off and being genuinely team ready, is one most competence systems aren’t designed to see. We came across a clear example of it somewhere you might not expect: a cardiac operating theatre.
Individually competent, collectively not yet ready
Competence frameworks and training matrices assess individuals. They’re good at confirming that a person can carry out their own steps correctly. But many of the errors that matter most in high-hazard work are caught, or missed, at the level of the team: someone noticing a skipped step, a reading that doesn’t fit, or a call that should have been made and wasn’t.
That kind of catching depends on a shared mental model: a common understanding of how the task unfolds, who is doing what, why, and what should happen next. It’s built through experience of working together, and it’s largely invisible to a training record.
Put simply, reliability is a team property, but our competence systems mostly measure individuals.
What we saw in heart surgery
In 2016, HRA worked with a team at a large regional hospital on a pilot to improve communication during coronary artery bypass grafting (CABG), one of the highest-volume, highest-stakes procedures a cardiac team performs.
Through a series of consensus workshops with an experienced CABG team, we built a Hierarchical Task Analysis (HTA) of the riskiest parts of the procedure: coming on and off bypass. We then filmed two live procedures and linked the video and communications transcripts to each step of the HTA. That material was used to train a second group: qualified, working professionals who were less experienced than the original team.
That second group is where the interesting finding sits. Their competence was not in question. Yet they had “not yet developed a sufficiently comprehensive shared mental model” of how the procedure unfolds, what each colleague was doing, why, and what to expect next.
We called this the vulnerable phase: the stretch after someone stops being classed as a trainee, but before they’ve built the working understanding that makes them reliable as part of a team. Not just able to perform their own steps, but able to anticipate what others are doing and notice when something doesn’t add up.
This isn’t a training failure. It’s the natural lag between being signed off and having lived through enough of the job, alongside the same people, for that understanding to form.
A note of honesty: this was a small pilot. The findings were interesting, but there wasn’t enough data for a medical journal publication, which is partly why we’re sharing it here. Treat it as an illustrative case rather than proof. The pattern, though, will be familiar to anyone who manages competence in a high-hazard industry.
Why turnover turns a phase into a standing condition
The vulnerable phase exists in every team. How much it costs depends on how long people stay, and how often they work with the same colleagues.
Some simple, illustrative numbers make the point. Suppose it takes around two years of working alongside colleagues to become genuinely team fluent. If people stay for three years on average, each person spends two of those three years in the vulnerable phase, so roughly two thirds of the team is in it at any one time. If average tenure drops to 18 months, most people leave before the gap ever closes, and the team as a whole never gets out of it.
High turnover doesn’t just create more of the vulnerable phase. It removes the thing that normally closes it.
Rotation makes this worse. CABG teams are often drawn from a rota rather than a fixed crew, so the informal rapport that might otherwise paper over the gap doesn’t reliably build. The same is true of shift-based operations, turnaround crews, contractor and agency staff, and any setting where people are qualified individually but rarely work in the exact same team twice. It’s a familiar picture across process, energy and nuclear operations.
In these settings, what matters isn’t only how long someone has been in the organisation. It’s how long they’ve worked with thesepeople, on this task. On that measure, many experienced workforces are closer to permanently new than their training records suggest.
Closing the gap deliberately
The useful part of the CABG pilot is that it didn’t leave the gap to close on its own. Rather than waiting for the second group to accumulate years of exposure, we walked them through the HTA of the on and off bypass stages, then through video of the real procedure with communications transcripts attached to each step. Participants could see not just what happened, but why colleagues said what they said.
Feedback was limited in scope, but where it landed it was telling. The nursing staff, who have deep expertise in their own critical steps but whose training doesn’t cover the technical side of the surgery, reported a much clearer picture of what was happening and when their input might be needed. After the walkthroughs, they could explain the sequence clearly themselves.
That’s the vulnerable phase narrowing, not through more time on the job, but through deliberate exposure to the structure and communications of the task before people would have pieced it together on their own.
A practical method you can use
The mechanism generalises well beyond surgery. Here is how it translates to a process, energy or nuclear setting:
- Pick the tasks where the team matters most. Start from your safety-critical tasks and focus on those that depend on handovers, cross-checks and coordination between roles.
- Build the task map with your most experienced people. Run consensus workshops to capture how the task is actually done, not just how the procedure says it’s done. The act of building it together draws out tacit knowledge that rarely gets written down.
- Capture how the task is talked through. Video and transcripts are ideal, but often impractical on a plant. Recorded walk-throughs, talk-throughs with experienced operators, or annotated examples of good communication at key steps can do much of the same job.
- Walk newcomers through it before they need it. Cover the structure of the task, who does what, the cues to watch for, and what to expect from others. Repeat it, as the CABG walkthroughs did.
- Check understanding, not attendance. Ask people to explain what happens next, who is responsible, and why a step is safety-critical. If they can’t, the gap is still open.
Where this fits with competence standards
In Beyond the Training Matrix: A Human Factors Approach to Competence Management, we argued that competence standards are strongest when built on structured Human Factors risk analysis, and that they should verify the knowledge behind a task: why specific steps are safety-critical, and how the task links to the hazards it controls.
That piece is about the standard people need to meet. This one is about the runway to get there. Structured knowledge elicitation won’t replace risk-informed competence standards, but it’s one of the more practical ways of getting people to meet them before turnover moves them on.
How long is your vulnerable phase?
If your organisation relies on rotating teams, contractor crews or high turnover, three questions are worth asking:
- How long does it take a newly signed-off person to become genuinely fluent in how your team works?
- How does that compare with how long people stay, or how often crews are reshuffled?
- What, if anything, is actively closing the gap, other than time?
If the honest answer to the last question is “not much”, our Hierarchical Task Analysis and Safety Critical Task Analysis pages explain how this kind of structured analysis works in practice, and how it can be built into training that shortens the gap rather than waiting it out. Or get in touch to talk through what it would look like for your teams.